Manned Orbiting Laboratory

Results: 61



#Item
1GEMINI BOARD MEETING LA SERENA, CHILE –14-16 NOVEMBER 2012 Resolutions Arising from theNovember 2012 Gemini Board Meeting 2012.B.1. The Board has executed an Assessment Point in accordance with Article 4 of the

GEMINI BOARD MEETING LA SERENA, CHILE –14-16 NOVEMBER 2012 Resolutions Arising from theNovember 2012 Gemini Board Meeting 2012.B.1. The Board has executed an Assessment Point in accordance with Article 4 of the

Add to Reading List

Source URL: www-sbf.gemini.edu

Language: English
2Gemini Observatory Response to STAC October 2012 Report January 17, 2013 UK withdrawal 3.1 The STAC thanks its UK colleagues for their expertise and advice and deeply regrets the loss of their contributions to the Gemini

Gemini Observatory Response to STAC October 2012 Report January 17, 2013 UK withdrawal 3.1 The STAC thanks its UK colleagues for their expertise and advice and deeply regrets the loss of their contributions to the Gemini

Add to Reading List

Source URL: www-sbf.gemini.edu

Language: English - Date: 2013-01-17 13:50:01
3Comparison of Adaptive Optics Technologies for GeminiStrehl

Comparison of Adaptive Optics Technologies for GeminiStrehl

Add to Reading List

Source URL: www.gemini.edu

Language: English - Date: 2008-05-30 19:38:28
4

PDF Document

Add to Reading List

Source URL: www-sbf.gemini.edu

Language: English - Date: 2013-07-19 18:15:26
5i3CA Shuttle Chronology 1964 — 1973 Abstract Concepts to Letter Contracts

i3CA Shuttle Chronology 1964 — 1973 Abstract Concepts to Letter Contracts

Add to Reading List

Source URL: www.astronautix.com

Language: English - Date: 2006-05-06 19:02:04
6   GEMINI BOARD MEETING LA SERENA, CHILE – 11-13 NOVEMBERResolutions Arising from theNovember 2009

  GEMINI BOARD MEETING LA SERENA, CHILE – 11-13 NOVEMBERResolutions Arising from theNovember 2009

Add to Reading List

Source URL: www.geminiargentina.mincyt.gob.ar

Language: English - Date: 2009-12-10 15:50:29
720 DECBIG G MCDONNELL.

20 DECBIG G MCDONNELL.

Add to Reading List

Source URL: www.astronautix.com

Language: English - Date: 2006-05-07 23:33:24
8GHOS Requirements • Based on Science White Papers • R ~40,000 with goal of 20,000 – 60,000 • 370 – 1000 nm (300 – 1100 nm goal) simultaneous coverage • Single object (multi-object goal)

GHOS Requirements • Based on Science White Papers • R ~40,000 with goal of 20,000 – 60,000 • 370 – 1000 nm (300 – 1100 nm goal) simultaneous coverage • Single object (multi-object goal)

Add to Reading List

Source URL: www.gemini.edu

Language: English - Date: 2012-08-03 20:59:51
9GPI Review Committee: Final Day Statement The GPI Pre-Delivery Acceptance Review Period commenced on the 8th July and concluded on the 19th July[removed]Eleven members of Gemini participated in the review along with two ex

GPI Review Committee: Final Day Statement The GPI Pre-Delivery Acceptance Review Period commenced on the 8th July and concluded on the 19th July[removed]Eleven members of Gemini participated in the review along with two ex

Add to Reading List

Source URL: www.gemini.edu

Language: English - Date: 2013-07-19 18:15:26
10USGEMINIPROGRAM T H E U N I T E D  S T A T E S

USGEMINIPROGRAM T H E U N I T E D S T A T E S

Add to Reading List

Source URL: www.noao.edu

Language: English - Date: 2002-12-04 12:31:42