Davis-Besse Nuclear Power Station

Results: 101



#Item
1UTILITY RADIOLOGICAL SAFETY BOARD OF OHIO DAVIS-BESSE NUCLEAR POWER STATION ADMINISTRATION BUILDING 5501 NORTH STATE ROUTE 2, OAK HARBOR, OHIOOCTOBER 9, :30 A.M. AGENDA I. ROLL CALL

UTILITY RADIOLOGICAL SAFETY BOARD OF OHIO DAVIS-BESSE NUCLEAR POWER STATION ADMINISTRATION BUILDING 5501 NORTH STATE ROUTE 2, OAK HARBOR, OHIOOCTOBER 9, :30 A.M. AGENDA I. ROLL CALL

Add to Reading List

Source URL: www.ursb.ohio.gov

Language: English - Date: 2013-01-25 11:17:21
    2Microsoft Word - NIRS ADVISORY Nuclear Reactors and Hurricanes.doc

    Microsoft Word - NIRS ADVISORY Nuclear Reactors and Hurricanes.doc

    Add to Reading List

    Source URL: www.nirs.org

    Language: English - Date: 2008-01-21 20:52:24
    3April 30, 2015 The Kansai Electric Power Co., Inc. Implementation of Special Inspection for Unit 3 at Mihama Nuclear Power Station The Kansai Electric Power Co., Inc. (Code: Nakanoshima 3-chome, Kita-ku, Osaka

    April 30, 2015 The Kansai Electric Power Co., Inc. Implementation of Special Inspection for Unit 3 at Mihama Nuclear Power Station The Kansai Electric Power Co., Inc. (Code: Nakanoshima 3-chome, Kita-ku, Osaka

    Add to Reading List

    Source URL: www.kepco.co.jp

    Language: English - Date: 2015-05-01 10:56:44
    4Lecture 4 – Case Studies (cont’d) Dr. V.G. Snell (With thanks to D. Meneley for some material[removed]:27 AM

    Lecture 4 – Case Studies (cont’d) Dr. V.G. Snell (With thanks to D. Meneley for some material[removed]:27 AM

    Add to Reading List

    Source URL: www.nuceng.ca

    Language: English - Date: 2015-01-11 13:22:21
    5NRC AUGMENTED INSPECTION TEAM EXIT MEETING DAVIS-BESSE REACTOR VESSEL HEAD CORROSION APRIL 5, 2002

    NRC AUGMENTED INSPECTION TEAM EXIT MEETING DAVIS-BESSE REACTOR VESSEL HEAD CORROSION APRIL 5, 2002

    Add to Reading List

    Source URL: www.nuceng.ca

    Language: English - Date: 2015-01-11 13:19:00
    6Severe Accident Management and Beyond Design Bases Event Response – an End-User Perspective International Atomic Energy Agency Vienna, Austria March 17, 2014

    Severe Accident Management and Beyond Design Bases Event Response – an End-User Perspective International Atomic Energy Agency Vienna, Austria March 17, 2014

    Add to Reading List

    Source URL: www-pub.iaea.org

    Language: English - Date: 2014-03-20 09:12:02
    7Davis-Besse, Transmittal of Final Report on Examination of the Reactor Vessel Head Degradation, and Safety Significance Assessment Update.

    Davis-Besse, Transmittal of Final Report on Examination of the Reactor Vessel Head Degradation, and Safety Significance Assessment Update.

    Add to Reading List

    Source URL: pbadupws.nrc.gov

    Language: English - Date: 2012-11-18 15:30:35
    8Davis-Besse, Unit 1, License Amendment 259 revising Safety Features Actuation System (SFAS) Instrumentation to Allow an 8-hr Delay in Entering an Action Statement when SFAS Instrumentation Channel is Undergoing Functiona

    Davis-Besse, Unit 1, License Amendment 259 revising Safety Features Actuation System (SFAS) Instrumentation to Allow an 8-hr Delay in Entering an Action Statement when SFAS Instrumentation Channel is Undergoing Functiona

    Add to Reading List

    Source URL: pbadupws.nrc.gov

    Language: English - Date: 2012-11-18 15:46:13
    9Sample questions to ask on NRC’s Feb. 20th Webinar re: Steam Generator Replacements at Davis-Besse 1. Given the recent revelation of the inadequate oversight and inspection of the Shield Building during closing of the

    Sample questions to ask on NRC’s Feb. 20th Webinar re: Steam Generator Replacements at Davis-Besse 1. Given the recent revelation of the inadequate oversight and inspection of the Shield Building during closing of the

    Add to Reading List

    Source URL: www.beyondnuclear.org

    Language: English - Date: 2014-02-20 09:51:27
    10QUESTIONS ASKED ON NRC DAVIS-BESSE STEAM GENERATOR REPLACEMENT WEBINAR By Kevin Kamps, Beyond Nuclear, Thursday, Feb. 20, 2014, 6 to 7 PM Eastern Q: How can NRC allow FirstEnergy to perform a “like-for -like” steam g

    QUESTIONS ASKED ON NRC DAVIS-BESSE STEAM GENERATOR REPLACEMENT WEBINAR By Kevin Kamps, Beyond Nuclear, Thursday, Feb. 20, 2014, 6 to 7 PM Eastern Q: How can NRC allow FirstEnergy to perform a “like-for -like” steam g

    Add to Reading List

    Source URL: www.beyondnuclear.org

    Language: English - Date: 2014-02-20 19:07:56