<--- Back to Details
First PageDocument Content
Wind power / Mesoscale meteorology / Wind / Wind power forecasting / Regional transmission organization / Midwest Independent Transmission System Operator / Electricity market / Forecasting / Electric Reliability Council of Texas / Electric power / Electric power distribution / Energy
Date: 2009-05-07 00:18:14
Wind power
Mesoscale meteorology
Wind
Wind power forecasting
Regional transmission organization
Midwest Independent Transmission System Operator
Electricity market
Forecasting
Electric Reliability Council of Texas
Electric power
Electric power distribution
Energy

Microsoft Word - IAEE_Botterud_etal_final.doc

Add to Reading List

Source URL: www.usaee.org

Download Document from Source Website

File Size: 229,66 KB

Share Document on Facebook

Similar Documents

Mathematics / Electromagnetism / Electric power / Electrical engineering / Power engineering / Power-flow study / Parameter / Variable

Automated Vulnerability Analysis of AC State Estimation under Constrained False Data Injection in Electric Power Systems Sicun Gao1 , Le Xie2 , Armando Solar-Lezama1 , Dimitrios Serpanos3 , and Howard Shrobe1 Abstract—

DocID: 1xU8c - View Document

March 20, 2018 Kyushu Electric Power Company Inc. Rejection of the Temporary Injunction against Restart of Genkai Nuclear Power Station Units No.3 and 4

DocID: 1vrhI - View Document

TRANSFORMER Power Planar Magnetics and Hybrid Electric Vehicles The HEVs are here – and more are coming The electronic circuits in a hybrid electric vehicle must operate in an extreme temperature

DocID: 1vn7A - View Document

Where Does Our Electric Power Come From? Since November 1, 2014, the Kirkwood Meadows Public Utility District has purchased all of its power (except for emergency diesel generation) off of the Western power grid. Grid po

DocID: 1vip9 - View Document

profiles Modernization and refurbishment of San Miguel Electric Cooperative’s Rothemühle® regenerative heat exchanger results in a 3 MW savings in plant auxiliary power. Recent upgrades to the Rothemühle regenerativ

DocID: 1v7GL - View Document