<--- Back to Details
First PageDocument Content
Structural engineering / 7 World Trade Center / Progressive collapse / Mechanical floor / September 11 attacks / Structural failure / Truss / Verizon Building / Collapse of the World Trade Center / World Trade Center / New York City / Architecture
Date: 2006-05-26 23:59:18
Structural engineering
7 World Trade Center
Progressive collapse
Mechanical floor
September 11 attacks
Structural failure
Truss
Verizon Building
Collapse of the World Trade Center
World Trade Center
New York City
Architecture

Untitled

Add to Reading List

Source URL: 911research.wtc7.net

Download Document from Source Website

File Size: 3,35 MB

Share Document on Facebook

Similar Documents

Truss Connectors TJC Jack Truss Connector TJC is a versatile connector for jack trusses. Adjustable from 0 to 85 degree (shipped with 67.5 degree bend). Nail hole locations allow for easy installation. • Minimum naili

DocID: 1vpsR - View Document

Bracing and Tiedowns H Hurricane Tie Hurricane ties provide a positive connection between the truss/rafter and the wall of the structure to resist wind and seismic forces. • The H2.5A connects the truss/rafter to the

DocID: 1vliA - View Document

Truss Connectors HTC Heavy Truss Clip The HTC roof truss clip ensures alignment between a roof truss and non‑bearing wall when the truss or rafter is not in contact with the top plates of the wall. Designed for applica

DocID: 1vlh8 - View Document

Residential Roof Truss Installation Procedures ihsa.ca Residential Roof Truss Installation Procedures

DocID: 1vl83 - View Document

Truss Connectors TCP Truss Clip The TCP truss clip provides a connection between girders, trusses and rafters and top plates to provide resistance to high‑wind loads. It is also ideal for strongback attachments and as

DocID: 1v3DR - View Document