<--- Back to Details
First PageDocument Content
Utility submeter / Water supply / Electric power distribution / Electricity meter / Pacific Gas and Electric Company / San Diego Gas & Electric / Plug-in electric vehicle / Energy / Electric power / Measurement
Date: 2013-11-19 14:43:43
Utility submeter
Water supply
Electric power distribution
Electricity meter
Pacific Gas and Electric Company
San Diego Gas & Electric
Plug-in electric vehicle
Energy
Electric power
Measurement

COM/CAP/avs Date of Issuance[removed]Decision[removed]November 14, 2013

Add to Reading List

Source URL: docs.cpuc.ca.gov

Download Document from Source Website

File Size: 754,16 KB

Share Document on Facebook

Similar Documents

Electricity Usage Profile Disaggregation of Hourly Smart Meter Data Bochao Zhao, Lina Stankovic, and Vladimir Stankovic Department of Electronic and Electrical Engineering University of Strathclyde, Glasgow, G1 1XW, UK E

DocID: 1vrHZ - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase electricity meter communicating on one phase. Testing was performed on ph

DocID: 1veLU - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase electricity meter communicating on 3 phases. Testing was performed on pha

DocID: 1vbeT - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase electricity meter communicating on 3 phases. Testing was performed on pha

DocID: 1uSXk - View Document

TRANSMISSION COMPANY OF NIGERIA (TCN) PUBLIC NOTICE INVITATION TO TENDER FOR ENGAGEMENT OF A REPUTABLE COMPANY FOR THE PROCUREMENT OF AUTOMATIC METER READING (AMR) AND DATA MANAGEMENT SYSTEM FOR THE NIGERIAN ELECTRICITY

DocID: 1umGi - View Document