Upstream

Results: 1000



#Item
641Ice / Minerals / Optical materials / Glaciology / Water

2013 – 2014 Peace River Report No. 42 An observation flight this morning located the ice front at km 468 (approx. 25 km upstream of Sunny Valley) at 11:27 MST. The ice front has been receding at a rate of approximately

Add to Reading List

Source URL: environment.alberta.ca

Language: English - Date: 2014-04-25 18:24:27
642Earth / Watershed and Flood Prevention Operations Program / Environment / Conservation Districts / United States Department of Agriculture / Hydrology / Watershed management

W ATERSHED INVESTMENT P ROGRAMS IN THE A MERICAN W EST AN UPDATED LOOK: LINKING UPSTREAM WATERSHED HEALTH & DOWNSTREAM SECURITY

Add to Reading List

Source URL: www.carpediemwest.org

Language: English - Date: 2012-05-12 12:28:10
643

Facilities of Groundwater Bypass ○ There are twelve pump-up wells placed on the upstream side of the buildings. ○ Pumped up groundwater is to be delivered to the special tank through special pipe and be stored tempor

Add to Reading List

Source URL: www.tepco.co.jp

- Date: 2014-05-20 04:17:26
    644Genetics / Kshatriya / Mers / Frequency / Gene / Statistics / Biology / Indian society

    Finding Over-Represented 6-mers in Upstream Regions Suppose we have a set of genes with similar expression profiles. Interpret “upstream region” as the 1000 bp just before the translation start site. (We might want t

    Add to Reading List

    Source URL: globin.cse.psu.edu

    Language: English - Date: 2002-03-21 12:46:59
    645Oils / Petroleum / Oil sands / Soft matter / Matter / Fuels

    Regulators’ Forum Alberta 2013 The Statistics Lost-Time Claim Rate by Upstream Oil

    Add to Reading List

    Source URL: www.psc.ca

    Language: English - Date: 2013-05-13 14:23:05
    646Dancing on Ice

    STUDY LIMIT AT UPSTREAM END OF HARRISON LAKE Harrison Lake

    Add to Reading List

    Source URL: www.env.gov.bc.ca

    Language: English - Date: 2008-04-08 16:25:00
      647Sampling / Survey methodology / Sampling techniques

      Subpart M - Pipeline Sampling (§§[removed]1. Cut into 40 foot segments, and number from upstream end. 2.

      Add to Reading List

      Source URL: epa.gov

      Language: English - Date: 2012-04-04 11:37:32
      648Water streams / Geomorphology / Earth / Fluvial landforms / Environmental soil science / Aggradation / Degradation / Erosion / Sediment / Geology / Sedimentology / Water

      River Dynamics Chambly Canal Excessive sediment from upstream is deposited in this reach of river that is too wide

      Add to Reading List

      Source URL: www.lcbp.org

      Language: English - Date: 2013-04-11 08:32:43
      649Environment / Fuel gas / Energy economics / Anaerobic digestion / Methane / Shale gas / Natural gas / Hydraulic fracturing / Gas flare / Energy / Fuels / Pollution

       Mismeasuring Methane Estimating Greenhouse Gas Emissions from Upstream Natural Gas Development

      Add to Reading List

      Source URL: www.cred.org

      Language: English - Date: 2014-11-26 12:26:21
      650Identification / Electronic commerce / Information / GS1 / Global Data Synchronization Network / GS1 Canada / Data quality / Global Commerce Initiative / International Article Number / Standards organizations / Barcodes / Identifiers

      GS1 and GCI Extend Standards Jos Vicente Escribano Named Chief Operating Officer of GS1 Meet the Needs of Upstream Suppliers

      Add to Reading List

      Source URL: www.gs1.org

      Language: English - Date: 2009-05-06 08:20:38
      UPDATE