<--- Back to Details
First PageDocument Content
Oil wells / Technology / BP / Oilfield terminology / Blowout / Reservoir simulation / Macondo Prospect / Petroleum reservoir / Flow Rate Technical Group / Petroleum production / Petroleum / Deepwater Horizon oil spill
Date: 2011-03-11 13:07:21
Oil wells
Technology
BP
Oilfield terminology
Blowout
Reservoir simulation
Macondo Prospect
Petroleum reservoir
Flow Rate Technical Group
Petroleum production
Petroleum
Deepwater Horizon oil spill

USGS Open-File Report[removed]

Add to Reading List

Source URL: pubs.usgs.gov

Download Document from Source Website

File Size: 483,34 KB

Share Document on Facebook

Similar Documents

Change of company name Under Part 4.5 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. In making an application please refer to the Offshore Petroleum and Greenhouse Gas Storage ActTitle details Ti

DocID: 1vrW8 - View Document

Request for a variation of condition(s) of title—petroleum special prospecting authority or petroleum access authority Under part 2.11 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. In making an applic

DocID: 1vqsh - View Document

Cash bid petroleum exploration permit: Cash bid form (prequalified applicants only) In accordance with Section 111 of the Offshore Petroleum and Greenhouse Gas Storage ActRelease Area Number (As published in the G

DocID: 1vq0j - View Document

ALABAMA LIQUEFIED PETROLEUM GAS BOARD P.O. Box 1742 TelephoneFax777 S. Lawrence St., Suite 100 Montgomery, AL

DocID: 1vpZ0 - View Document

ALABAMA LIQUEFIED PETROLEUM GAS BOARD P.O. Box 1742 TelephoneFax777 S. Lawrence St., Suite 100 Montgomery, AL

DocID: 1vpSP - View Document