Back to Results
First PageMeta Content
Manned spacecraft / International Space Station / Space Shuttle / International Space Station program / DIRECT / Kwatsi Alibaruho / STS-129 / Spaceflight / Human spaceflight / Space Shuttle program


STS- 121 CoFR ENDORSEMENT EL~MENT SERIAL NUMBER ORBITER
Add to Reading List

Document Date: 2013-06-26 23:20:43


Open Document

File Size: 3,86 MB

Share Result on Facebook

Company

BOEING ISS PRIME M / the Boeing / /

Currency

GBP / /

Facility

International Space Station / SPA DATt / Kennedy Space Center / /

IndustryTerm

hardware/software / life support systems / ground systems / manufacturing / hardware element processing specifications / launch processing/ assembly/testing / main engine controller software / /

Movie

]DY / S D. A / /

NaturalFeature

Flight Mt / /

Organization

Kennedy Space Center / FRR Board / SpACE OPERATIONS MISSION DIRECTORATE / STENNIS SPACE CENTER / National Aeronautics and Space Administration / /

Person

Jun / MARSHALL SPACE / R. DAVIS NASA / HAMILTON S UNDSTRAND / /

Position

MANAGER / SFOC / CONTRACTOR / PROGRAM MANAGER / DIRECTOR / SPACE AND LIFE SCIENCES obi J. R. / /liP EVA PROGRAM MANAGER / DEPUTY MANAGER / SPACE SHUTTLE PROGRAM / MANAGER / DIRECTOR / A§SISTANASSOCIATE ADMINISTRATOR / CONTRACTOR PAYLOAD PROCESSING PROGRAM MANAGER / CAPPS BOEING / DIRECTOR / SPACEANDLIFE / MANAGER / CAPPS BOEING / ADMINISTRATOR / MANAGER / SSME PROJECT / SEABACK DATE DIRECTOR / CHAIR / ISS/PAYLOAD PROCESSING DATE R. R. ROMANELLA DATE MANAGER / DIRECTOR OF ISS/PAYLOAD PROCESSING DATE R. R. ROMANELLA DATE / R. S. WILLIAMS CHIEF HEALTH AND MEDICAL OFFICER / ASSISTANT / MANAGER / ISS / controller / DIRECTOR / FLIGHT CREW OPERATIONS / DIRECTOR / SPACE AND LIFE SCIENCES obi J. / /

Product

Space Shuttle Program / TNt / /

ProgrammingLanguage

C / /

PublishedMedium

the Flight Readiness Review / the Stage Operations Readiness Review / /

SocialTag