Back to Results
First PageMeta Content
Environment / Hydrology / Environmental soil science / Aquifers / Turbidity / Surface runoff / Subsurface flow / Lake / Soil / Water / Earth / Water pollution


September 2013 in Our Catchment It rained. It was wonderful. The timing was perfect. The planting Day with the American Embassy staff was Friday 13th. The ground on the slope up to the footpath at East O’Malley Wetland
Add to Reading List

Open Document

File Size: 198,84 KB

Share Result on Facebook

Company

Molonglo Catchment Group / /

Facility

Toad Hall / /

IndustryTerm

high energy sheet runoff / car park / /

MusicGroup

Yes / /

NaturalFeature

Googong Creek / /

Organization

Australian Government / American Embassy / ACT Government / /

Position

sites Stephen Skinner Catchment Officer / /

SocialTag