<--- Back to Details
First PageDocument Content
National Institute of Aeronautics and Space / Science and technology in Indonesia / Lapan-TUBsat / Satellites / Polar Satellite Launch Vehicle / Astrosat / Indian Space Research Organisation / Communications satellite / Orari / Spaceflight / Indian space program / Unmanned vehicles
Date: 2010-08-13 15:38:56
National Institute of Aeronautics and Space
Science and technology in Indonesia
Lapan-TUBsat
Satellites
Polar Satellite Launch Vehicle
Astrosat
Indian Space Research Organisation
Communications satellite
Orari
Spaceflight
Indian space program
Unmanned vehicles

Add to Reading List

Source URL: www.aprsaf.org

Download Document from Source Website

File Size: 2,82 MB

Share Document on Facebook

Similar Documents

Digital media / Social networks / Communication / New media / Social media / Web 2.0 / Advertorial / Human behavior / Public sphere

Media Kit 2018 Fintechnews Network Fintechnews Universe Websites are planets, subsites and social media are satellites

DocID: 1xTJi - View Document

APRS Link Budgets for Psat, BRICsat and USS Mission Uplinks: Uplink and downlink missions for APRS are unbalanced. The minimum APRS mission for all satellites is to receive at least one mobile or handheld user transmi

DocID: 1vj5P - View Document

Reporting Methods The GOES DCS system design had several factors. First is to be able to perform reliable two-way communication between unmanned small stations and synchronous satellites. The basics of that technology

DocID: 1va71 - View Document

Optical acquisition module 6 Hz ÷ 15 MHz OAM305 TESEO plug-in systems and remote satellites are fiber optic communication links for the

DocID: 1v9IA - View Document

REVOLUTIONIZING SATELLITE MANUFACTURING THROUGH PLUG AND PLAY PROBLEM:SATELLITE COSTS ERODE PROFITS AND LIMITS THE SERVICES “ (satellites) lead times used to be 36 months,” said Jean-Loïc Galle, CEO of Thales Aleni

DocID: 1uQPW - View Document