Riser

Results: 412



#Item
241Siphon / Technology / Fluid dynamics / Riser / Tank

State of Oregon Department of Environmental Quality Water Quality Division, Onsite Program Dosing Tank <1,000 Gallons Engineered Plan Requirements/Self Certification Form

Add to Reading List

Source URL: www.deq.state.or.us

Language: English - Date: 2010-01-05 15:04:03
242Building engineering / Standpipe / Structural system / Stairway / Technology / Roof / Dry riser / Fire suppression / Architecture / Construction

DOC Document

Add to Reading List

Source URL: www.calfireslo.org

Language: English - Date: 2014-04-25 14:30:52
243Handrail / Newel / Shall and will / Riser / Stair riser / Bicycle stairway / Stairways / Architecture / Building engineering

HUMBODLT COUNTY BUILDING DEPARTMENT

Add to Reading List

Source URL: www.hcnv.us

Language: English - Date: 2014-06-25 18:39:42
244Irrigation / Technology / Water / Agriculture / Fire suppression / Active fire protection / Fire sprinkler

INSTALLATION HydroKnot can be installed in both new and existing irrigation systems in order to eliminate or minimize the uncontrolled waste of water from a damaged, broken or missing sprinkler head or riser. HydroKnot w

Add to Reading List

Source URL: www.hydroknot.com

Language: English - Date: 2013-08-01 02:01:44
245Architecture / Technology / Fire sprinkler / Stairway / Riser / Turbine / Fire suppression / Active fire protection / Safety

1 Zone-Level Testing The following tests were conducted to qualify how HydroKnot units perform within an entire zone, across multiple sprinkler heads. Zone Test Specifications and Configurations Specifications

Add to Reading List

Source URL: www.hydroknot.com

Language: English - Date: 2013-09-17 00:02:19
246Concrete / Plumbing / Precast concrete / Reuse / Architecture / Public utilities / Casting / Pipe / Riser / Visual arts / Construction / Piping

Refer to SW-514 for boxout details. 1 SW-603 Type R unless Type Q is specified in the contract documents.

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2014-05-05 10:18:32
247Jewellery making / Metallurgy / Riser / Ductile iron / Polyvinyl chloride / Manufacturing / Chemistry / Visual arts / Casting

NOTES 1. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS. VARIABLE INVERT, SUMP, AND BASIN BODY HEIGHT AVAILABLE. RISERS ARE NEEDED FOR BASINS OVER 84" (IN) DUE TO SHIPPING

Add to Reading List

Source URL: www.wsdot.wa.gov

Language: English - Date: 2014-10-02 16:25:24
248Visual arts / Public utilities / Street furniture / Environmental engineering / Water pollution / Manhole / Precast concrete / Riser / Stairway / Subterranea / Physical geography / Environment

1 Cast-in-place base shown. If base is precast integral with bottom riser, the footprint of the base is not required to extend beyond the outer edge of the riser.

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2014-05-05 10:18:30
249Riser / Casting / Pipe / Piping / Visual arts / Plumbing

1 Precast (shown) or cast-in-place base: Precast: 6 inch thick concrete with #6 welded wire mesh on 4 inch centers (WWF 4'' x 4''). Center mesh vertically within base.

Add to Reading List

Source URL: www.iowadot.gov

Language: English - Date: 2014-05-05 10:18:34
250Drew Brees / Kurt Warner / 2011–12 NFL playoffs / 2004–05 NFL playoffs / National Football League / Super Bowl MVPs / Peyton Manning

FOR USE AS DESIRED September 30, 2013 http://twitter.com/NFL345 WHAT TO LOOK FOR – A LOOK BACK EARLY RISER: Denver quarterback PEYTON MANNING passed for 327 yards and four touchdowns in the Broncos’ 5220 win over Phi

Add to Reading List

Source URL: nfllabor.files.wordpress.com

Language: English - Date: 2013-09-30 14:04:58
UPDATE