<--- Back to Details
First PageDocument Content
North American Electric Reliability Corporation / Regional transmission organization / FirstEnergy / Electric utility / Generating Availability Data System / Electrical grid / PECO Energy Company / ReliabilityFirst / Midwest Independent Transmission System Operator / Electric power / Energy / PJM Interconnection
Date: 2004-08-25 08:23:42
North American Electric Reliability Corporation
Regional transmission organization
FirstEnergy
Electric utility
Generating Availability Data System
Electrical grid
PECO Energy Company
ReliabilityFirst
Midwest Independent Transmission System Operator
Electric power
Energy
PJM Interconnection

Microsoft Word - @3q@01!.DOC

Add to Reading List

Source URL: www.puc.state.pa.us

Download Document from Source Website

File Size: 1,13 MB

Share Document on Facebook

Similar Documents

IEEE TRANSACTIONS ON SMART GRID, VOL. 2, NO. 2, JUNEDigital Grid: Communicative Electrical Grids of the Future

DocID: 1v34e - View Document

GRID CODE – RULES FOR ELECTRICAL TRANSMISSION SYSTEM OPERATION GRID CODE

DocID: 1uHZl - View Document

1 Dynamic Load Altering Attacks in Smart Grid Sajjad Amini† , Hamed Mohsenian-Rad† , and Fabio Pasqualetti‡ of Electrical and Computer Engineering, University of California, Riverside, CA, USA ‡ Department of Me

DocID: 1uuPs - View Document

Energy Routing on the Future Grid: A Stochastic Network Optimization Approach Marjan Baghaie, Scott Moeller, Bhaskar Krishnamachari Department of Electrical Engineering University of Southern California, Los Angeles, 900

DocID: 1ud0N - View Document

Universal response tactics for electricity In a fire involving electrical facilities, confirm your dispatcher has notified National Grid. Work with National Grid’s on-scene representative in a unified command structur

DocID: 1u0qa - View Document