R-Phase

Results: 594



#Item
231Nozzles / Rocket propulsion

Executive Order VR-201-R and VR-202-R Assist Phase II EVR System Exhibit 7 NOZZLE BAG TEST PROCEDURE

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2014-12-10 15:01:03
232Physics / Chemical engineering / Pressure / Psychrometrics / Water vapor / Separator / Vapor / Phase / Operability / Gases / Thermodynamics / Chemistry

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-202-R Relating to Certification of Vapor Recovery Systems Assist Phase II Enhanced Vapor Recovery (EVR) System including In-Station Diagnostics (ISD)

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2014-12-10 15:02:33
233Oscillators / Vertical-cavity surface-emitting laser / Crystal oscillator / Microwave / Laser / Atomic clock / Phase-locked loop / Resonance / Voltage-controlled oscillator / Physics / Electronic engineering / Electronics

THE CHIP-SCALE ATOMIC CLOCK – PROTOTYPE EVALUATION R. Lutwak* and A. Rashed Symmetricom - Technology Realization Center† M. Varghese, G. Tepolt, J. LeBlanc, and M. Mescher Charles Stark Draper Laboratory

Add to Reading List

Source URL: www.aventasinc.com

Language: English - Date: 2010-09-14 06:18:46
234Chemical engineering / Physical quantities / Building engineering / Heating /  ventilating /  and air conditioning / Sustainable building / Phase-change material / Thermal conductivity / R-value / Thermal insulation / Heat transfer / Chemistry / Mechanical engineering

NUMERICAL STUDY OF THE INFLUENCE OF THE THICKNESS AND MELTING POINT ON THE EFFECTIVENESS OF PHASE CHANGE MATERIALS: APPLICATION TO THE RENOVATION OF A LOW INERTIA SCHOOL

Add to Reading List

Source URL: www.ibpsa.org

Language: English - Date: 2009-07-12 13:25:44
235Contract law / Warranty / Implied warranty

Executive Order VR-202-R Assist Phase II EVR System Including In-Station Diagnostic (ISD) Systems Exhibit 6 MANUFACTURER WARRANTIES

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2014-12-10 15:02:17
236Ball valve / Technology / Construction / Fluid mechanics / Petroleum production / Separator / Valve

Executive Order VR-201-R and VR-202-R Assist Phase II EVR System Exhibit 8 REQUIRED ITEMS IN CONDUCTING TP-201.3

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2014-12-10 15:02:18
237Pressure / Underwater diving / Atmospheric thermodynamics / Gases / Psychrometrics / Pressure measurement / Water vapor / Vapor pressure / Vacuum / Thermodynamics / Physics / Measurement

Executive Order VR-202-R Assist Phase II EVR System Including In-Station Diagnostic (ISD) Systems Exhibit 9 VEEDER-ROOT ISD OPERABILITY TEST PROCEDURE

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2014-12-10 15:02:18
238Gasoline

Executive Order VR-202-R Assist Phase II EVR System Including In-Station Diagnostic (ISD) Systems Exhibit 11 LIQUID CONDENSATE TRAP COMPLIANCE TEST PROCEDURE

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2014-12-10 15:02:19
    239Space / Stellar astronomy / Interferometry / Electromagnetic spectrum / Infrared / Astronomical interferometer / Closure phase / W. M. Keck Observatory / Star / Astronomy / Electromagnetic radiation / Observational astronomy

    THE ASTROPHYSICAL JOURNAL, 534 : 907È914, 2000 May[removed]The American Astronomical Society. All rights reserved. Printed in U.S.A. NEAR- AND MID-INFRARED SUBARCSECOND STRUCTURE OF THE DUSTY SYMBIOTIC STAR R AQUARII

    Add to Reading List

    Source URL: isi.ssl.berkeley.edu

    Language: English - Date: 2005-06-13 13:51:55
    240Ball valve / Technology / Construction / Fluid mechanics / Petroleum production / Separator / Valve

    Executive Order VR-201-R and VR-202-R Assist Phase II EVR System Exhibit 8 REQUIRED ITEMS IN CONDUCTING TP-201.3

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:01:03
    UPDATE