R-Phase

Results: 594



#Item
221Gasoline

Executive Order VR-201-R Assist Phase II EVR System Not Including In-Station Diagnostic (ISD) Systems Exhibit 9 LIQUID CONDENSATE TRAP COMPLIANCE TEST PROCEDURE

Add to Reading List

Source URL: www.arb.ca.gov

Language: English - Date: 2014-12-10 15:01:03
    222Engineering / Vacuum / Pressure measurement / Valve / Technology / Petroleum production / Separator

    Executive Order VR-201-R and VR-202-R Assist Phase II EVR System Exhibit 4 DETERMINATION OF STATIC PRESSURE PERFORMANCE OF THE CLEAN AIR SEPARATOR

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:02:16
    223Nozzles / Rocket propulsion

    Executive Order VR-201-R and VR-202-R Assist Phase II EVR System Exhibit 7 NOZZLE BAG TEST PROCEDURE

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:02:18
    224Hose / Separator / Space technology / Transport / Rocketry / Nozzles / Technology / Rocket propulsion

    Executive Order VR-201-R Assist Phase II EVR System Not Including ISD Exhibit 3 MANUFACTURING PERFORMANCE STANDARDS AND SPECIFICATIONS

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:01:01
    225Contract law / Warranty

    Executive Order VR-201-R Assist Phase II EVR System Not Including In-Station Diagnostic (ISD) Systems Exhibit 6 MANUFACTURER WARRANTIES

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:01:02
    226Quantum optics / Quantum mechanics / Coherence / Optical aberration / Laser / Degree of coherence / Gaussian beam / Optics / Physics / Electromagnetic radiation

    Phase Diffuser at the Transmitter for Lasercom Link: Effect of Partially Coherent Beam on the Bit-Error Rate. O. Korotkova*a, L. C. Andrews**a, R. L. Phillips***b Dept. of Mathematics, Univ. of Central Florida; bFlorida

    Add to Reading List

    Source URL: pegasus.cc.ucf.edu

    Language: English - Date: 2003-12-18 20:43:35
    227VR Group / BitTorrent tracker / Business / Beta software / MetaTracker / Gilbarco Veeder-Root

    Executive Orders VR-201-R and VR-202-R Assist Phase II EVR System Exhibit 12 VEEDER-ROOT MAINTENANCE TRACKER (Optional) Definitions common to all certification and test procedures are in:

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:02:19
    228Petroleum production / Separator / Plumbing / Piping / Valve / Water vapor / Thermodynamics / Technology / Water

    Executive Order VR-202-R Assist Phase II EVR System Including In-Station Diagnostics (ISD) Systems Exhibit 2 SYSTEM SPECIFICATIONS

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:02:16
    229Flow measurement / Soft matter / Chemistry / Matter / Gases / Gasoline / Vapor recovery

    Executive Order VR-201-R and VR-202-R Assist Phase II EVR System Exhibit 5 VAPOR TO LIQUID VOLUME RATIO (Healy Model 900 EVR Nozzle)

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:01:02
    230Atmospheric thermodynamics / Pressure / Pressure sensor / Sensors / Video game console / Hydrostatic test / Fluid mechanics / Fluid power / Soft matter

    Executive Order VR-202-R Assist Phase II EVR System Including In-Station Diagnostic (ISD) Systems Exhibit 3 MANUFACTURING PERFORMANCE STANDARDS AND SPECIFICATIONS

    Add to Reading List

    Source URL: www.arb.ca.gov

    Language: English - Date: 2014-12-10 15:02:16
    UPDATE