Back to Results
First PageMeta Content
Ancient Greek technology / Crane / Agricultural machinery / Derrick / Aerial work platform / Fly system / Counterweight / Box crib / Forklift truck / Transport / Technology / Engineering vehicles


APPLICATION FOR PIER LOADING PERMIT A. The purpose of the Pier Loading Permit is to identify the dead load and live load that will be placed on the pier and compare it with the allowable loading limits. Based on these ca
Add to Reading List

Document Date: 2015-05-15 15:18:21


Open Document

File Size: 461,02 KB

Share Result on Facebook

Company

CRANE / The Quonset Development Corporation / P.E. Quonset Development Corporation / Page 6 Quonset Development Corporation / /

Country

United States / /

Currency

USD / /

Facility

PIER LOADING PERMIT INSURANCE REQUIREMENTS Prior to / _____Davisville Pier / Pier Loading Permit Page / Pier Loading Permit / Dock Loading Permit / /

IndustryTerm

fender systems / load bearing computer software programs / self-contained loading equipment / Insurance amounts / terminal loading/unloading operators / cargo lifting equipment / transport equipment / coverage insurance / said equipment / insurance requirements / substructure utilities / /

Person

Comprehensive Liability / Pier Loading / Edward J. Spinard / /

Position

duly authorized representative / Property Damage Combined General / licensed crane operator / Or General / Development Services Director / professional engineer / D. Workman / C. Automobile General / A. B. Or General / /

Product

Crane Hire Rate / /

ProvinceOrState

Rhode / Rhode Island / /

Technology

cellular telephone / /

SocialTag