<--- Back to Details
First PageDocument Content
Architecture / Technology / Portland cement / Clinker / Pozzolan / Ground granulated blast-furnace slag / Fly ash / Mortar / Kiln / Cement / Concrete / Construction
Date: 2005-03-14 15:26:11
Architecture
Technology
Portland cement
Clinker
Pozzolan
Ground granulated blast-furnace slag
Fly ash
Mortar
Kiln
Cement
Concrete
Construction

42 CEMENT

Add to Reading List

Source URL: minerals.usgs.gov

Download Document from Source Website

File Size: 20,32 KB

Share Document on Facebook

Similar Documents

2 Higher Kiln Quarry Management Committee

DocID: 1uwYZ - View Document

Slow Ramp Kiln Tests Kiln was ramped 260° per hour to a firing temperature of 600°c and held at 600°c for 30 minutes. Gemstone type Tanzanite Green Topaz

DocID: 1ucFD - View Document

SECOND SENATE DISTRICT Second. Part of York County comprised of the Bethel (502), Coventry (203), Edgehill (303), and Kiln CreekPrecincts; part of the City of Hampton comprised of the Aberdeen (101), Armstrong (10

DocID: 1u5tm - View Document

Kiln: Closing the Performance Gap Between Systems With and Without Persistence Support Jishen Zhao† Sheng Li‡ Doe Hyun Yoon∗ Yuan Xie†

DocID: 1tIM5 - View Document

tm_kiln_symbol_v_1_4c_100 v2

DocID: 1sNi4 - View Document