Poker Flat Research Range

Results: 80



#Item
1National Aeronautics and Space Administration  What’s Inside

National Aeronautics and Space Administration What’s Inside

Add to Reading List

Source URL: sites.wff.nasa.gov

Language: English - Date: 2007-06-27 13:55:07
2Arctic Council Use of Unmanned Aircraft Systems in the Arctic Marty W. Rogers, Director  1

Arctic Council Use of Unmanned Aircraft Systems in the Arctic Marty W. Rogers, Director 1

Add to Reading List

Source URL: arctic-council.org

Language: English - Date: 2015-08-31 06:37:06
3National Aeronautics and Space Administration  NASA Sounding Rockets Annual Report 2015

National Aeronautics and Space Administration NASA Sounding Rockets Annual Report 2015

Add to Reading List

Source URL: sites.wff.nasa.gov

Language: English - Date: 2016-02-02 08:02:38
4Sounding Rocket Working Group National Aeronautics and Space Administration Meeting of January 20-21, 2016 Findings 1. Ensuring Critical Connections Are Made Correctly Summary

Sounding Rocket Working Group National Aeronautics and Space Administration Meeting of January 20-21, 2016 Findings 1. Ensuring Critical Connections Are Made Correctly Summary

Add to Reading List

Source URL: rscience.gsfc.nasa.gov

Language: English - Date: 2016-05-11 15:06:13
5UNIVERSITY OF ALASKA FAIRBANKS P.O. BoxFairbanks, AKADDRESS SERVICE REQUESTED W W w. u a f. e d u

UNIVERSITY OF ALASKA FAIRBANKS P.O. BoxFairbanks, AKADDRESS SERVICE REQUESTED W W w. u a f. e d u

Add to Reading List

Source URL: news.uaf.edu

Language: English - Date: 2012-12-11 15:52:55
6Poker Flat Research Range (PFRR) Itinerary 5:00 pm - depart hotel, drive to PFRR with brief stop at pipeline viewing point 6:00 pm - arrival at PFRR and start of facility tour 7:30 pm - approximate end of tour 7:45 pm -

Poker Flat Research Range (PFRR) Itinerary 5:00 pm - depart hotel, drive to PFRR with brief stop at pipeline viewing point 6:00 pm - arrival at PFRR and start of facility tour 7:30 pm - approximate end of tour 7:45 pm -

Add to Reading List

Source URL: www.agu.org

- Date: 2015-04-16 11:32:54
    7Poker Flat Research Range / University of Alaska Fairbanks

    Downlink: 2013:320:07:24::320:07:35:19 PF1 Problem:  Poker Flat PF1 and PF2 Red for Commercial Power Outage   START OF ANOMALY: 318 06:40:00           ETRO: Unknown   Loss of Commercial Power to

    Add to Reading List

    Source URL: eo1.gsfc.nasa.gov

    Language: English - Date: 2013-11-18 12:26:33
    8Poker Flat Research Range / University of Alaska Fairbanks

    Downlink: 2013:319:03:35::319:03:44:00 PF1 Problem:  Poker Flat PF1 and PF2 Red for Commercial Power Outage   START OF ANOMALY: 318 06:40:00           ETRO: Unknown   Loss of Commercial Power to

    Add to Reading List

    Source URL: eo1.gsfc.nasa.gov

    Language: English - Date: 2013-11-18 12:24:43
    9UAFLogo_A_White_notxt_nooutline

    UAFLogo_A_White_notxt_nooutline

    Add to Reading List

    Source URL: www.uaf.edu

    Language: English - Date: 2015-03-18 14:09:56
    10Near Earth Network / Poker Flat Research Range

    U P D A T E D  Near Earth Network Link Commitment Schedule NEN SITE OPERATIONAL HOURS  WALLOPS, ASF, USN POKER FLAT (PF1 and PF2), MCMURDO and SVALBARD, NORWAY (SG1) operational support hours are 7 X 24. 

    Add to Reading List

    Source URL: esc.gsfc.nasa.gov

    Language: English - Date: 2015-05-18 09:30:46