Piezometer

Results: 197



#Item
71Hydraulic engineering / Earth / Aquifers / Geotechnical engineering / Hydrogeology / Groundwater / Water table / Piezometer / Losing stream / Hydrology / Water / Physical geography

Interconnection of Surface and Groundwater Systems – River Losses from Losing/Disconnected Streams Border Rivers Site Report Lamontagne, S., Taylor, A.R., Cook, P.G., Gardner, W.P., O’Rourke, M. Final Revised Version

Add to Reading List

Source URL: www.clw.csiro.au

Language: English - Date: 2011-08-07 23:14:33
72Hydraulic engineering / Environment / Aquifers / Land management / Hydrogeology / Piezometer / Soil salinity control / Hydraulic head / Groundwater recharge / Hydrology / Water / Earth

Chapter 10 — Waters Field tests for waters Field tests are useful as a preliminary survey of the extent and distribution of salinity in a catchment or area. Water samples can be obtained from existing water access poin

Add to Reading List

Source URL: publications.qld.gov.au

Language: English - Date: 2013-12-19 01:07:54
73Physical geography / Aquifers / Geotechnical engineering / Hydraulic engineering / Groundwater / Water table / Piezometer / Regolith / Lake / Water / Hydrology / Earth

Microsoft Word - Kimber_et_al.doc

Add to Reading List

Source URL: crcleme.org.au

Language: English - Date: 2009-01-14 01:26:25
74Hydrology / Murray River / Riverina / Soil science / Earth / Mulwala Canal / Murray Irrigation Area / Irrigation / Piezometer / Water / Land management / Water management

Microsoft Word - Rpt0263.docx

Add to Reading List

Source URL: www.murrayirrigation.com.au

Language: English - Date: 2012-07-08 20:46:30
75Hydraulic engineering / Aquifers / Civil engineering / Geotechnical engineering / Hydrogeology / Piezometer / Groundwater / Hydraulic head / Water well / Hydrology / Water / Physical geography

Interconnection of Surface and Groundwater Systems – River Losses from Losing/Disconnected Streams Lachlan River Site Report Lamontagne, S., Taylor, A.R., Crosbie, R.S., Cook, P.G., Kumar, P.B. Final Revised Version 16

Add to Reading List

Source URL: www.clw.csiro.au

Language: English - Date: 2011-08-08 01:25:29
76Soil mechanics / Geology / Hydraulic engineering / Hydrology / Piezometer / Landslide / Embankment / Pore water pressure / Construction / Geotechnical engineering / Civil engineering

The influence of vegetation and climate on clay earthwork slopes Dr Joel Smethurst Faculty of Engineering and the Environment Overview

Add to Reading List

Source URL: www.bgs.ac.uk

Language: English - Date: 2015-02-10 11:00:22
77Civil engineering / Earth / Geotechnical engineering / Aquifers / Water wells / Piezometer / Hydraulic head / Longwall mining / Groundwater / Hydrology / Water / Hydraulic engineering

Microsoft Word[removed]R04C - Preferred Project Impact Assessment_06[removed]d…

Add to Reading List

Source URL: www.moolarbencoal.com.au

Language: English
78Earth / Groundwater / Hyporheic zone / Dryland salinity / Aquifer / Stream / Piezometer / Hydrological modelling / River / Water / Hydrology / Physical geography

Groundwater and stream interactions in Widden Brook, upper Hunter Valley, New South Wales

Add to Reading List

Source URL: crcleme.org.au

Language: English - Date: 2009-01-14 01:26:55
79Soft matter / Geotechnical engineering / Water wells / Hydraulic engineering / Aquifers / Borehole / Piezometer / Drilling rig / Groundwater / Hydrology / Civil engineering / Water

Towards a Groundwater Management Operating Strategy for the Tamala Park Landfill: Progress Report G.B. Davis, N. Innes, R.J. Woodbury and A. Märki Report to the Mindarie Regional Council

Add to Reading List

Source URL: www.clw.csiro.au

Language: English - Date: 2006-07-24 01:59:58
80

LEGEND LEASE BOUNDARY EXISTING PIEZOMETER

Add to Reading List

Source URL: www.ashtoncoal.com.au

- Date: 2011-02-17 17:59:52
    UPDATE