<--- Back to Details
First PageDocument Content
Construction / Project manager / Project management / Quality assurance / IBM Rational Unified Process / Miami / Business / Florida / Management / Building engineering / South Florida Regional Transportation Authority
Date: 2011-08-17 13:04:15
Construction
Project manager
Project management
Quality assurance
IBM Rational Unified Process
Miami
Business
Florida
Management
Building engineering
South Florida Regional Transportation Authority

Microsoft Word - PMP DRAFT[removed]

Add to Reading List

Source URL: www.sfrta.fl.gov

Download Document from Source Website

File Size: 152,68 KB

Share Document on Facebook

Similar Documents

Global Supplier of Steam Condensers and Related Technology Engineering Expertise Quality and innovation go into the building of each Ecolaire steam surface condenser. . .on the drawing board, on the

DocID: 1vhsY - View Document

Building Ontologies by using Re-engineering Patterns and R2RML Mappings Freddy Priyatna1 and Boris Villaz´on-Terrazas1 1 OEG-DIA, FI, Universidad Polit´ecnica de Madrid, Spain

DocID: 1vg5p - View Document

International Journal of Engineering and Technology, Vol. 9, No.2, 2012, ppGREEN BUILDING INDEX EVALUATION FOR UNIVERSITY BUILDINGS N. Jayaseelan1, Faieza Abdul Aziz2 and Rosnah Mohd. Yusuff2, Norzima Zulk

DocID: 1vdTZ - View Document

Fire Engineering Research and Education at LTH My interest in fire engineering design aroused during the period between 1959 and 1964, when I was Professor of Building Technology and Structural Design at the KTH (Royal U

DocID: 1vbNf - View Document

Seismic collapse analysis on core-outrigger structures F.F. Sun, R.X. Ge & J.M. Xu Dept. Of Building Engineering, College of Civil Engineering

DocID: 1uWIU - View Document