<--- Back to Details
First PageDocument Content
Spacecraft propulsion / Satellites / Single-stage-to-orbit / Non-rocket spacelaunch / Space elevator / Space tether / Momentum exchange tether / Tether / Mass driver / Aerospace engineering / Space technology / Transport
Date: 2011-04-12 17:37:48
Spacecraft propulsion
Satellites
Single-stage-to-orbit
Non-rocket spacelaunch
Space elevator
Space tether
Momentum exchange tether
Tether
Mass driver
Aerospace engineering
Space technology
Transport

AIAA[removed]DESIGN AND SIMULATION OF TETHER FACILITIES FOR THE HASTOL ARCHITECTURE R. Hoyt Tethers Unlimited, Inc., Seattle, WA

Add to Reading List

Source URL: www.tethers.com

Download Document from Source Website

File Size: 513,14 KB

Share Document on Facebook

Similar Documents

Media Kit 2018 Fintechnews Network Fintechnews Universe Websites are planets, subsites and social media are satellites

Media Kit 2018 Fintechnews Network Fintechnews Universe Websites are planets, subsites and social media are satellites

DocID: 1xTJi - View Document

APRS Link Budgets for Psat, BRICsat and USS Mission Uplinks: Uplink and downlink missions for APRS are unbalanced. The minimum APRS mission for all satellites is to receive at least one mobile or handheld user transmi

DocID: 1vj5P - View Document

Reporting Methods The GOES DCS system design had several factors. First is to be able to perform reliable two-way communication between unmanned small stations and synchronous satellites. The basics of that technology

DocID: 1va71 - View Document

Optical acquisition module 6 Hz ÷ 15 MHz OAM305 TESEO plug-in systems and remote satellites are fiber optic communication links for the

Optical acquisition module 6 Hz ÷ 15 MHz OAM305 TESEO plug-in systems and remote satellites are fiber optic communication links for the

DocID: 1v9IA - View Document

REVOLUTIONIZING SATELLITE MANUFACTURING THROUGH PLUG AND PLAY PROBLEM:SATELLITE COSTS ERODE PROFITS AND LIMITS THE SERVICES “ (satellites) lead times used to be 36 months,” said Jean-Loïc Galle, CEO of Thales Aleni

REVOLUTIONIZING SATELLITE MANUFACTURING THROUGH PLUG AND PLAY PROBLEM:SATELLITE COSTS ERODE PROFITS AND LIMITS THE SERVICES “ (satellites) lead times used to be 36 months,” said Jean-Loïc Galle, CEO of Thales Aleni

DocID: 1uQPW - View Document