First Page | Document Content | |
---|---|---|
![]() Date: 2004-08-25 08:23:42North American Electric Reliability Corporation Regional transmission organization FirstEnergy Electric utility Generating Availability Data System Electrical grid PECO Energy Company ReliabilityFirst Midwest Independent Transmission System Operator Electric power Energy PJM Interconnection | Add to Reading List |
![]() | Duke Energy Midwest Connection RequirementsDocID: 1kAwx - View Document |
![]() | New York’s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an “energy highway” aimed at finding ways to reliDocID: 1gAbf - View Document |
![]() | Eastern Wind Integration and Transmission Study: Executive Summary and Project OverviewDocID: 1gpIa - View Document |
![]() | Utility Wind Integration and Operating Impact State of the ArtDocID: 1gcKv - View Document |
![]() | Microsoft PowerPoint - MN Wind Integration Study presentation - Dec 2006.pptDocID: 1g6Ad - View Document |