Labor and materials

Results: 490



#Item
1

Syracuse University Environmental Health and Safety Services Common Asbestos Containing Materials Per NYS DOL Code Rule 56 This guidance document provides an excerpt from NYS Department of Labor’s Asbestos Regulations

Add to Reading List

Source URL: ehss.syr.edu

Language: English - Date: 2017-03-14 10:35:12
    2

    “Battery Competitiveness: Determined by Scale, Materials, Structure and Safety” Low Ratio Labor Cost While the cost reduction of energy storage technology (secondary batteries) is driven by the lithium

    Add to Reading List

    Source URL: cleantech.nikkeibp.co.jp

    Language: English - Date: 2013-11-05 20:37:35
      3

      Agricultural Justice Project Toolkit of Materials and Resources for Farmers Agricultural Justice Project Toolkit of Materials and Resources for Farmers: 1.0: Hiring Labor.

      Add to Reading List

      Source URL: www.agriculturaljusticeproject.org

      Language: English - Date: 2016-11-17 14:43:54
        4

        1. WARRANTY EXPLANATION — PLEASE READ CAREFULLY Rane offers a limited warranty, described in full on the Limited Warranty card included in the packing materials, which covers both parts and labor necessary to repair

        Add to Reading List

        Source URL: www.rane.com

        Language: English - Date: 2018-05-23 23:55:36
          5

          Internet Appendix for “The Labor Market for Directors and Externalities in Corporate Governance” DORON LEVIT and NADYA MALENKO The Internet Appendix has three sections. Section I contains supplemental materials for

          Add to Reading List

          Source URL: www2.bc.edu

          - Date: 2016-04-03 12:21:04
            6

            3- OR 4- STRAND HIGH TENSION CABLE BARRIER JSP 06-07C 1.0 Description. This work shall consist of all labor, equipment, and materials to remove, install, repair, and replace a 3- or 4- strand cable barrier system incl

            Add to Reading List

            Source URL: spexternal.modot.mo.gov

            - Date: 2015-12-10 12:20:25
              7

              RAW PUMP NO. 4 MOTOR AND STARTER REPLACEMENT Columbus Water Works Board of Water Commissioners Columbus, Georgia Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessity for the

              Add to Reading List

              Source URL: www.cwwga.org

              - Date: 2016-07-25 14:04:10
                8

                REPORT ON MATCHING AND IN-KIND EXPENDITURES Please summarize all resources expended on the project other than those funded by the Trust. Examples of these costs could include materials, labor, donations, other grants, ma

                Add to Reading List

                Source URL: www.environmentaltrust.org

                - Date: 2013-09-19 13:54:43
                  9Contract law / Warranty / Law / Implied warranty / Common law / MagnusonMoss Warranty Act / Extended warranty

                  LIMITED WARRANTY This product is warranted by TEAC America, Inc. against defects in materials and workmanship. LENGTH OF WARRANTY – This warranty will be effective for both labor and parts, and this warranty will be ef

                  Add to Reading List

                  Source URL: audio.teac.com

                  Language: English - Date: 2016-07-28 19:57:26
                  10ETH Domain / Switzerland / Science and technology / Business cluster / Innovation / Swiss Federal Laboratories for Materials Science and Technology / Zrich / Swiss Federal Institute of Aquatic Science and Technology / ETH Zurich / Zurich metropolitan area / Draft:Crypto Valley

                  4. Building for the Current and Next Generations: The Swiss Innovation Park Bruno Sauter, Office for Economy and Labor Canton of Zurich Nina Geilinger, ETH Zurich

                  Add to Reading List

                  Source URL: www.amcham.ch

                  Language: English - Date: 2014-07-13 11:51:00
                  UPDATE