Back to Results
First PageMeta Content
High-voltage direct current / HVDC Moyle / EirGrid / Electric power transmission / Power station / National Grid / Electric power / Electromagnetism / Energy


Operational Constraints Update 17th October 2014 Key Updates  Active Ireland Constraints: Removal of PBC as a temporary must run from the Dublin Generation constraint.
Add to Reading List

Document Date: 2014-10-17 10:15:55


Open Document

File Size: 473,12 KB

Share Result on Facebook
UPDATE