<--- Back to Details
First PageDocument Content
Structural engineering / Structural system / I-35W Mississippi River bridge / Interstate 35 / Girder bridge / Structural failure / Tacoma Narrows Bridge / Box girder / Forensic engineering / Civil engineering / Engineering / Bridges
Date: 2011-08-11 13:27:03
Structural engineering
Structural system
I-35W Mississippi River bridge
Interstate 35
Girder bridge
Structural failure
Tacoma Narrows Bridge
Box girder
Forensic engineering
Civil engineering
Engineering
Bridges

Primer for the Inspection and Strength Evaluation

Add to Reading List

Source URL: www.fhwa.dot.gov

Download Document from Source Website

File Size: 2,83 MB

Share Document on Facebook

Similar Documents

Registration Form Forensic Engineering Insurance

DocID: 1v79C - View Document

Flyer for Forensic Engineering Insurance Landscape

DocID: 1uj4W - View Document

Proceedings of 10th Intl. Conference on Systematic Approaches to Digital Forensic Engineering AN EMPIRICAL STUDY ON CURRENT MODELS FOR REASONING ABOUT DIGITAL EVIDENCE Stefan Nagy1, Imani Palmer1, Sathya Chandran Sundar

DocID: 1tdW3 - View Document

Sketch Based Face Recognition: Forensic vs. Composite Sketches Scott Klum, Hu Han, Anil K. Jain Department of Computer Science and Engineering Michigan State University, East Lansing, MI, U.S.A. Brendan Klare

DocID: 1s1zg - View Document

Biology / Molecular biology / Biotechnology / Biochemistry / Chemistry / DNA / Polymerase chain reaction / Forensic genetics / Restriction enzyme / Restriction digest / Restriction fragment

Meet a Scientist: Dr. Barbara J. Shaw Connecting the Science, Technology, Engineering, and Math concepts to our everyday lives. DNA

DocID: 1roYM - View Document