FOD

Results: 844



#Item
221Elevator / HVAC / Basement / Asbestos / Plumbing / Architecture / Building engineering / Construction

FACILITY AUDIT REPORT BRICKER HALL, Bldg 001 JANUARY 31, 1994 Prepared by: James P. Hertenstein

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
222Construction / Heating /  ventilating /  and air conditioning / Building biology / HVAC / Mechanical room / Elevator / Floor / Asbestos / Basement / Architecture / Building engineering / Rooms

FACILITY AUDIT REPORT AGRICULTURAL ADMINISTRATION BUILDING #003 MAY 31, 1998 AGRICULTURAL ADMINISTRATION BUILDING

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
223Engineering / Elevator / Mechanical room / HVAC / Asbestos / Chiller / Floor / Heating /  ventilating /  and air conditioning / Architecture / Construction

FACILITY AUDIT REPORT BOYD LABORATORY #110 FEBRUARYPrepared by: Augustus J. R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
224Signage / Sign

Interior Construction Signage Guidelines 1. The Project Manager (PM) needs to determine if Interior Construction Signs are needed for the

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2015-03-23 12:02:19
225Elevator / Asbestos / Curtain wall / HVAC / Heating /  ventilating /  and air conditioning / Building engineering / Architecture / Construction

FACILITY AUDIT REPORT DRINKO HALL, Bldg 049 AUGUST 1995 Prepared by: Augustus J. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
226Rooms / Heating /  ventilating /  and air conditioning / Sustainable building / Structural system / HVAC / Elevator / Asbestos / Wall / Plumbing / Architecture / Building engineering / Construction

FACILITY AUDIT REPORT ELECTROSCIENCE LABORATORY, Bldg 009 MARCH 15, 1994 Prepared by: James P. Hertenstein

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
227Mechanical room / Rooms / HVAC / Asbestos / Elevator / Thermostat / EPDM rubber / Technology / Construction / Heating /  ventilating /  and air conditioning / Architecture / Building biology

FACILITY AUDIT REPORT INDEPENDENCE HALL #338 JUNE 30, 1999 INDEPENDENCE HALL

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
228Alarms / Locks / Doors / Access control / Identity management / Burglar alarm / Key / Card reader / Physical security / Security / Safety / Locksmithing

Microsoft Word - manual_cards.doc

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2009-03-23 17:38:06
229Heating /  ventilating /  and air conditioning / Structural engineering / Rooms / Mechanical engineering / Chiller / Reinforced concrete / Basement / Elevator / Asbestos / Architecture / Construction / Building engineering

FACILITY AUDIT REPORT HOWLETT HALL #295 DECEMBERPrepared by: Augustus J.R. Van Buren

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
230Chicago school / Monadnock Building / Tushiyah United Hebrew School – Scott Memorial Methodist Episcopal Church

FACILITY AUDIT REPORT BROWN HALL #016 AUGUST 31, 1999 BROWN HALL

Add to Reading List

Source URL: fod.osu.edu

Language: English - Date: 2003-04-07 12:37:38
UPDATE