Back to Results
First PageMeta Content
Design / Design for X / Impact assessment / Life-cycle assessment / Tunnel / Software development process / Cost / Science / Evaluation / Industrial ecology / Bridges / Software engineering


The economic optimization of tunnels by applying the life-cycle cost analysis Markus Thewes, Univ.-Prof. Dr.-Ing., Ruhr-University Bochum, Germany Jürgen Schwarz, Univ.-Prof. Dr.-Ing., Bundeswehr University Munich, Germ
Add to Reading List

Document Date: 2015-04-10 23:16:27


Open Document

File Size: 403,17 KB

Share Result on Facebook
UPDATE