<--- Back to Details
First PageDocument Content
Evaluation / Quality assurance / Building engineering / Quality / Quality control / Submittals / Specification / Management / Technology / Business / Standards
Date: 2014-10-07 16:07:10
Evaluation
Quality assurance
Building engineering
Quality
Quality control
Submittals
Specification
Management
Technology
Business
Standards

Section 4-11 Quality Control and Assurance

Add to Reading List

Source URL: www.dot.ca.gov

Download Document from Source Website

File Size: 47,56 KB

Share Document on Facebook

Similar Documents

Project Administrative Procedures 1) Submittals and Shop Drawings: Please prepare your submittals, shop drawings and samples in the following form: a) Catalog Cuts and Manufacturers Data: Submit six copies of catalog cut

DocID: 1vjNp - View Document

California Office of Historic Preservation Detailed Recommendations for Section 106 Consultation Submittals This document provides guidance for federal agencies consulting with the State Historic Preservation Officer (SH

DocID: 1uRF1 - View Document

Enclosure 2 Data Submittal Requirements for data that cannot be submitted via CEDEN: 1. All submittals shall be in electronic format that is PC compatible, preferably in Microsoft OfficeReferences to Web site

DocID: 1tmmy - View Document

FPB POLICY: PLAN SUBMITTALS FOR LESS THAN 21 SPRINKLERS Created: July 17, 2009 Revised: January 24, 2014 Effective Date: Immediately From the Office of the Fire Prevention Bureau – PhoneThis pol

DocID: 1tmll - View Document

FY 2017 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) PROJECT SUBMITTAL FORM Submittals are due by 4:00 p.m. on January 23, 2017 at the Office of the Laredo City Secretary 1110 Houston Street, 3rd floor A total of $717,903 i

DocID: 1tk12 - View Document