DAMP Project

Results: 14



#Item
1Microsoft Word - NET Telemetry Grant Press Release

Microsoft Word - NET Telemetry Grant Press Release

Add to Reading List

Source URL: www.npnrd.org

Language: English - Date: 2016-04-21 10:50:49
2Hurricane Resistance of Foam-strengthened Roofs Exposed to Water Leakage David O. Prevatt, Assistant Professor, Ph.D., P.E. Department of Civil and Coastal Engineering University of Florida Project motivation: Florida ho

Hurricane Resistance of Foam-strengthened Roofs Exposed to Water Leakage David O. Prevatt, Assistant Professor, Ph.D., P.E. Department of Civil and Coastal Engineering University of Florida Project motivation: Florida ho

Add to Reading List

Source URL: flash.org

Language: English - Date: 2011-08-20 18:39:59
3Microsoft Word - Nailplate Project Final Report & Recommendations.doc

Microsoft Word - Nailplate Project Final Report & Recommendations.doc

Add to Reading List

Source URL: www.fwpa.com.au

Language: English - Date: 2014-05-23 02:11:28
4Garratt’s Damp & Timber Ltd..  Woodworm Treatment – White Barn The 300 year old White Barn was an interesting survey and project. The initial inspection was requested by the owner and coincided with works being carri

Garratt’s Damp & Timber Ltd.. Woodworm Treatment – White Barn The 300 year old White Barn was an interesting survey and project. The initial inspection was requested by the owner and coincided with works being carri

Add to Reading List

Source URL: www.dampproofing-london.co.uk

Language: English - Date: 2012-10-10 14:22:41
5A project of Volunteers  in Asia LaCeta Ram: Una Maquina para Producir

A project of Volunteers in Asia LaCeta Ram: Una Maquina para Producir

Add to Reading List

Source URL: www.howtomakeeverything.com

Language: English - Date: 1999-09-26 02:22:06
6Balachandran and Gehad, 2011 Report, 1  CONSERVATION REPORT, THE AMHEIDA PROJECT, JANUARY 2011 PREPARED BY S. BALACHANDRAN AND B. GEHAD SUMMARY OF WORK THIS SEASON: We were on site from the 9th to the 16th of January, 20

Balachandran and Gehad, 2011 Report, 1 CONSERVATION REPORT, THE AMHEIDA PROJECT, JANUARY 2011 PREPARED BY S. BALACHANDRAN AND B. GEHAD SUMMARY OF WORK THIS SEASON: We were on site from the 9th to the 16th of January, 20

Add to Reading List

Source URL: www.amheida.org

Language: English - Date: 2011-08-19 14:16:35
7Written Testimony of Beth Mellen Harrison Supervising Attorney & Director, Court Based Legal Services Project Legal Aid Society of the District of Columbia Committee on the Environment, Public Works, and Transportation C

Written Testimony of Beth Mellen Harrison Supervising Attorney & Director, Court Based Legal Services Project Legal Aid Society of the District of Columbia Committee on the Environment, Public Works, and Transportation C

Add to Reading List

Source URL: www.legalaiddc.org

Language: English - Date: 2013-10-04 15:33:30
8CALIFORNIA STATE SCIENCE FAIR 2003 PROJECT SUMMARY Name(s)  Natasha N. Jundt

CALIFORNIA STATE SCIENCE FAIR 2003 PROJECT SUMMARY Name(s) Natasha N. Jundt

Add to Reading List

Source URL: www.usc.edu

Language: English - Date: 2003-05-17 02:06:42
9 RESEARCH AND PRACTICE   The Seattle-King County Healthy Homes Project: A Randomized, Controlled Trial of a Community Health Worker Intervention to Decrease Exposure to Indoor Asthma Triggers

 RESEARCH AND PRACTICE  The Seattle-King County Healthy Homes Project: A Randomized, Controlled Trial of a Community Health Worker Intervention to Decrease Exposure to Indoor Asthma Triggers

Add to Reading List

Source URL: coep.pharmacy.arizona.edu

Language: English - Date: 2009-11-10 16:13:39
10Technical specification for Storage facility component:  Location of project: 1. Province: Faryab. 2. District: Almar. 3. Village: Besh Qarah.

Technical specification for Storage facility component:  Location of project: 1. Province: Faryab. 2. District: Almar. 3. Village: Besh Qarah.

Add to Reading List

Source URL: www.acted.org

Language: English - Date: 2014-07-17 11:35:28