<--- Back to Details
First PageDocument Content
Technology / Management / Interoperability / Telecommunications / Quality assurance / Conformance testing / Specification / Test plan / Validation / Software testing / Quality / Evaluation
Date: 2012-04-24 05:18:05
Technology
Management
Interoperability
Telecommunications
Quality assurance
Conformance testing
Specification
Test plan
Validation
Software testing
Quality
Evaluation

Guideline Project Acronym: PEPPOL

Add to Reading List

Source URL: joinup.ec.europa.eu

Download Document from Source Website

File Size: 584,88 KB

Share Document on Facebook

Similar Documents

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase electricity meter communicating on one phase. Testing was performed on ph

DocID: 1veLU - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase meter communicating on 1 phase. Testing was performed on phase 1. Operatin

DocID: 1vbgd - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase electricity meter communicating on 3 phases. Testing was performed on pha

DocID: 1vbeT - View Document

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator communicating on three phases. Testing was performed on

DocID: 1v86w - View Document

The Testcenter facility ‘LoRa® Test Lab’ within IMST GmbH is recognized by the LoRa™ Alliance for testing in accordance to the LoRaWAN™ Specification V1.0.1 Report for Test of Conformance to LoRaWAN™ V1.0.1 fo

DocID: 1uXQP - View Document