Back to Results
First PageMeta Content
Tasmanian energy crisis / Electric power / Bass Strait / Communications in Australia / Basslink / Economy of Australia / Malcolm Eccles / Hydro Tasmania / Interconnector / Connect Tasmania Core


Media statement 8 June 2016 Basslink interconnector update Basslink is pleased to announce that the third and final joint of the cable repair has now been completed and successfully tested. The cable bight has also been
Add to Reading List

Document Date: 2016-06-07 22:01:28


Open Document

File Size: 190,90 KB

Share Result on Facebook