Back to Results
First PageMeta Content
Heating /  ventilating /  and air conditioning / Ventilation / Tunnel / Cooling tower / Mechanical fan / Channel Tunnel / Ground-coupled heat exchanger


- 29 - PRELIMINARY VENTILATION AND COOLING DURING THE CONSTRUCTION OF THE BRENNER BASE TUNNEL A. Busslinger (*), R. Insam (**) (*) HBI Haerter AG, Switzerland
Add to Reading List

Document Date: 2016-05-03 05:57:36


Open Document

File Size: 246,56 KB

Share Result on Facebook