<--- Back to Details
First PageDocument Content
Bay Area Rapid Transit / Carole Ward Allen / AC Transit / San Francisco Municipal Railway / Oakland /  California / Downtown Oakland / Bay Area Rapid Transit expansion / Transportation in California / Transportation in the United States / California
Date: 2013-10-10 02:08:02
Bay Area Rapid Transit
Carole Ward Allen
AC Transit
San Francisco Municipal Railway
Oakland
California
Downtown Oakland
Bay Area Rapid Transit expansion
Transportation in California
Transportation in the United States
California

DECEMBER 2004 ACKNOWLEDGEMENTS This project was funded by Caltrans through a CONSULTANT TEAM:

Add to Reading List

Source URL: www.bart.gov

Download Document from Source Website

File Size: 2,66 MB

Share Document on Facebook

Similar Documents

Alternative Package 1 – Express Bus/HOV/Operational Improvements - Operating Cost Item 4.3 Expansion of Express Bus on Bay Bridge Annual Express Bus Operating Cost A. Operating Cost Subtotal B. Contingency (30%)

Alternative Package 1 – Express Bus/HOV/Operational Improvements - Operating Cost Item 4.3 Expansion of Express Bus on Bay Bridge Annual Express Bus Operating Cost A. Operating Cost Subtotal B. Contingency (30%)

DocID: 1asZe - View Document

$4B for 4 BART stations OR $2B for 100 ATN stations? The $4000M (million) price tag of burrowing a tunnel under San Jose for BART is too costly financially, and draws resources away from other transit options. The projec

$4B for 4 BART stations OR $2B for 100 ATN stations? The $4000M (million) price tag of burrowing a tunnel under San Jose for BART is too costly financially, and draws resources away from other transit options. The projec

DocID: 13C8b - View Document

Microsoft Word[removed]Phase 2B - Interim Modes report - final

Microsoft Word[removed]Phase 2B - Interim Modes report - final

DocID: Xfnb - View Document

Group #3 – Phase II Community Questions and Comments[removed]Question: Berryessa and Alum Rock stations each have planned multi-level parking garages that will accommodate 2,500-3,500 vehicles combined. With no parkin

Group #3 – Phase II Community Questions and Comments[removed]Question: Berryessa and Alum Rock stations each have planned multi-level parking garages that will accommodate 2,500-3,500 vehicles combined. With no parkin

DocID: T8Wk - View Document

Walnut Creek CSP FY04.pdf

Walnut Creek CSP FY04.pdf

DocID: JqsB - View Document