California Proposition 1A / California High-Speed Rail / Bay Area Rapid Transit / San Francisco Municipal Railway / High-speed rail / Transportation planning / Bay Area Rapid Transit expansion / High-speed rail in the United States / Transportation in California / Transportation in the United States / California
Date: 2014-10-09 18:38:51
California Proposition 1A
California High-Speed Rail
Bay Area Rapid Transit
San Francisco Municipal Railway
High-speed rail
Transportation planning
Bay Area Rapid Transit expansion
High-speed rail in the United States
Transportation in California
Transportation in the United States
California

October 9, 2014 Orville Thomas[removed]w[removed]c) [removed]

Add to Reading List

Source URL: www.hsr.ca.gov

Download Document from Source Website

File Size: 383,90 KB

Share Document on Facebook

Similar Documents

Alternative Package 1 – Express Bus/HOV/Operational Improvements - Operating Cost Item 4.3 Expansion of Express Bus on Bay Bridge Annual Express Bus Operating Cost A. Operating Cost Subtotal B. Contingency (30%)

Alternative Package 1 – Express Bus/HOV/Operational Improvements - Operating Cost Item 4.3 Expansion of Express Bus on Bay Bridge Annual Express Bus Operating Cost A. Operating Cost Subtotal B. Contingency (30%)

DocID: 1asZe - View Document

$4B for 4 BART stations OR $2B for 100 ATN stations? The $4000M (million) price tag of burrowing a tunnel under San Jose for BART is too costly financially, and draws resources away from other transit options. The projec

$4B for 4 BART stations OR $2B for 100 ATN stations? The $4000M (million) price tag of burrowing a tunnel under San Jose for BART is too costly financially, and draws resources away from other transit options. The projec

DocID: 13C8b - View Document

Microsoft Word[removed]Phase 2B - Interim Modes report - final

Microsoft Word[removed]Phase 2B - Interim Modes report - final

DocID: Xfnb - View Document

Group #3 – Phase II Community Questions and Comments[removed]Question: Berryessa and Alum Rock stations each have planned multi-level parking garages that will accommodate 2,500-3,500 vehicles combined. With no parkin

Group #3 – Phase II Community Questions and Comments[removed]Question: Berryessa and Alum Rock stations each have planned multi-level parking garages that will accommodate 2,500-3,500 vehicles combined. With no parkin