Annulus

Results: 264



#Item
151Technology / Wireline / Casing / Well logging / Water well / Annulus / FutureGen / Oil wells / Petroleum / Petroleum production

FutureGen COnstruction Details

Add to Reading List

Source URL: www.epa.gov

Language: English - Date: 2014-03-31 16:28:35
152Technology / Oilfield terminology / Petroleum production / Hydrology / Casing / Artesian aquifer / Borehole / Annulus / Casing string / Petroleum / Oil wells / Water wells

ARTESIAN WELL PLAN OF OPERATIONS (for new well construction) An Artesian Well Plan of Operations shall be filed with and approved by the Office of the State Engineer prior to commencing the drilling of an artesian well.

Add to Reading List

Source URL: www.ose.state.nm.us

Language: English - Date: 2012-02-14 11:27:00
153Casing / Injection well / Water injection / Natural gas / Annulus / Water well / Downhole oil–water separation technology / Petroleum / Oil wells / Petroleum production

TITLE 267 – NEBRASKA OIL AND GAS CONSERVATION COMMISSION CHAPTER 4 - UNDERGROUND INJECTION 002 APPROVAL OF ENHANCED RECOVERY INJECTION WELLS OR DISPOSAL

Add to Reading List

Source URL: www.nogcc.ne.gov

Language: English - Date: 2014-08-20 15:46:32
154Technology / Wireline / Casing / Well logging / Water well / Annulus / FutureGen / Oil wells / Petroleum / Petroleum production

FutureGen Construction Detials

Add to Reading List

Source URL: www.epa.gov

Language: English - Date: 2014-03-31 16:28:56
155Chemistry / Oilfield terminology / Completion / Wellhead / Carbon capture and storage / Casing / Annulus / Carbon dioxide / Pressure measurement / Oil wells / Petroleum / Petroleum production

Attachment C: Testing and Monitoring Plan - April 2014

Add to Reading List

Source URL: www.epa.gov

Language: English - Date: 2014-04-16 14:03:28
156Casing / Completion / Wellhead / Well logging / Perforation / Water well / Production tubing / Annulus / Gas lift / Petroleum production / Oil wells / Petroleum

ADM Response to EPA Second Request for Additional Information

Add to Reading List

Source URL: www.epa.gov

Language: English - Date: 2013-01-17 10:29:14
157Technology / Wireline / Casing / Completion / Well control / Slickline / Annulus / Blowout preventer / Well logging / Oil wells / Petroleum production / Petroleum

Attachment D: Injection Well Plugging Plan - April 2014

Add to Reading List

Source URL: www.epa.gov

Language: English - Date: 2014-04-16 14:03:27
158Technology / Wireline / Casing / Well logging / Water well / Annulus / FutureGen / Oil wells / Petroleum / Petroleum production

FutureGen Construction Details

Add to Reading List

Source URL: www.epa.gov

Language: English - Date: 2014-03-31 16:28:14
159Technology / Wireline / Casing / Well logging / Water well / Annulus / FutureGen / Oil wells / Petroleum / Petroleum production

FutureGen Construction Details

Add to Reading List

Source URL: www.epa.gov

Language: English - Date: 2014-03-31 16:27:55
160Oilfield terminology / Petroleum geology / Notary public / Annulus / Petroleum / Oil wells / Notary

location to nearest unit line

Add to Reading List

Source URL: www.ogb.state.al.us

Language: English - Date: 2013-07-08 17:42:50
UPDATE